11/4 Group Email
The quote has been updated,
signed and we're on Tony Peterson's work schedule. It will probably be
about two weeks for him to start. He'll start at the 'back', with Badger
Lane, Hook's Way & Gilbert, working his way out. These roads haven't
received any attention and are in the worst shape. Tony and I also discussed
the possible need for materials on Gilbert as it climbs the hill after the
turn from Canyon Ridge. Tony will evaluate after bar ditching and grading
to see if he can turn up enough usable material. If not, he'll call me with
an estimate.
THX
Bob Hanken
10/21 Group Email
Hi all. Sorry for the delay in updating
but I've been very busy and quotes from Tony take about two weeks to
receive. The first quote I received left off High Ridge, Judy Ranch (to
McMurray only-property owners need to remove trees to be able to do any work
on the 'new' road that was cut in; it's too narrow and would be a waste of
$'s without tree removal - any volunteers to contact the owners?), Hooks Way
and Badger Lane. The second quote, copies attached, left off High Ridge.
Tony is correcting to add High Ridge, but it may take another week to get
it.
Quote Summary:
-$4810 for bar ditching, grading and
sloping driveway entries (to keep water flowing in the ditches).
-Because of the dry conditions we'll
probably need the water truck. I'm estimating 5 hours @ $80 per hour; water
@ $75 per load, an additional $875.
-Snow removal quote (It will include High
Ridge, should be corrected on the next quote) is for up to 2 feet, an
additional $125 if over 2 feet and up to 4 feet.
The bank account stands at about $15,800.
I propose we have Tony do the work per the quote as the first step. Tony
will be making notes while doing the work and make recommendations for
culverts,... and other improvements. Once the first step is completed then
we can look at the budget, Tony's suggestions and go from there.
Please respond with your vote to proceed,
don't proceed-comments/suggestions,...as soon as possible, no later next
Sunday, 10/28.
THX
Bob Hanken
10-21-07 attachment
1Tony Peterson Qt Pg 1.pdf
10-21-07 attachment
2Tony Peterson Qt Pg 2.pdf
<
Meeting
notes from 9/1/07 weekend events here
Don H,(email webmaster for
full name, an contact information)
a fellow section 31 property
owner (way in the back). has donated a sign
that i requested.
anyway, sign is for out at beginning of
section 31.
SECTION 31
ROAD
MAINTENANCE
INFORMATION
WWW.SECTION31ROADS.COM
That should catch everyone as they pass
through.
Moreover, Don also has kindly offered to
provide anyone who would like, additional
signs.
(these are real "official"
road signs).
such as,
Begin Private Drive
End Public Road
No Trespassing
not a thru street
private drive
pavement ends
no outlet
for just cost of producing the signs, and a
very small labor charge. (smok'in deal if you
ask me)
email to webmaster:
webmaster@section31roads.com
©Copyright
2007 section31roads.com
all rights reserved